The COP / AVC project included a shell remodel and TI. The shell remodel included a new fire sprinkler service, fire
separation ratings and to bring the existing building to code for a medical facility. Construction also included the
installation of an emergency backup generator and it’s enclosure as well as upgraded electrical and gas services.
The tenant improvement for Azura Vascular Care included pre-screening/exam facility and outpatient
operation/surgery center housed in the same building. The construction included:
– Operation surgery rooms
– Exam, vein room and clinic support
– Post and pre-op patient rooms
– Laboratory, clean and soiled utility
– MEP systems included med gas, humidification control, medical grade wiring and nurse call systems
– Coordination with local and state inspection agencies.