The Levi’s Stadium featured pre-construction and construction services for the 68,500-seat football stadium at the Great America site in Santa Clara. Devcon’s preconstruction effort began in 1997 with the passing of the voter approved ballot measures to construct a stadium and mall at Candlestick Point. Devcon performed pre-construction services for the Candlestick Point location and other locations throughout the Bay Area at various times in the early 2000’s until the project restarted in 2006 with a new architect at the Candlestick location.

In 2006, Devcon acting as CMAR with the 49ers interviewed and selected Turner Construction as a design/build partner and formed Turner/Devcon, a joint venture. In 2008, the project moved to Santa Clara at its current location. Design/build pre-construction services included stadium and sitework estimating, structural and MEP systems constructability and life cycle analysis, design/build scope of work and criteria, scheduling and GMP bidding. Construction broke ground in April 2012 and completed in July 2014.

Project Type
Sector
Square Footage
Value
Construction Status
Interior Renovation/Tenant Improvement
Residential - Luxury, High Rise Stadia
1,000,000 SF
Between $500M and $1BN+
Complete