Project Profile: MSW Building was a 86,000 SF Pre Engineered Metal Building. The entire slab was poured in one continuous pour.
Fulcrum Admin Building was a 14,000 SF Pre Engineered Metal Building housing the engineering and operations team for Fulcrum Biofuels.
Fulcrum Electrical Buildings project was two Pre Engineered Metal Buildings that were designed with a stilt foundation to allow for electrical feeds to be accessed through open air space under the building.